| Field area | A digital GNSS workflow can be practical across large or irregular projects when correction coverage and a usable sky view are available. | A rotating transmitter creates a local reference plane. Large projects may require transmitter planning or relocation depending on range and obstructions. |
|---|
| Line of sight | No optical line of sight to a laser transmitter is required, but the antennas need adequate satellite visibility and a reliable correction link. | The implement receiver must detect the rotating laser plane; the transmitter is normally elevated above field and machine obstructions. |
|---|
| Terrain and design | Supports a digital 3D reference workflow. AG808 material describes plane, single-slope and dual-slope modes plus cut-and-fill display. | Well suited to creating a physical reference plane or selected slope. More complex terrain should be checked against the transmitter and controller capability. |
|---|
| Weather and environment | Performans depends on satellite visibility, multipath, radio or network conditions, antenna placement and correction quality. | Performans depends on the transmitter, receiver, visibility and equipment environmental ratings. Dust, obstruction and setup stability must be managed. |
|---|
| Hassasiyet | There is no universal accuracy winner. Verify the complete GNSS, correction, calibration and machine-control system under the intended field conditions. | Laser systems can provide a precise local reference plane. Verify the model, range, calibration, receiver and hydraulic response under field conditions. |
|---|
| Setup | Requires antenna and controller installation, machine and implement offsets, a base or supported correction service, and the intended digital design. | Requires a stable transmitter position and elevation, a receiver on the implement, controller/hydraulic integration and a checked reference plane. |
|---|
| Cost | Compare hardware, correction service, base infrastructure, digital design, installation, training and support across the expected fleet and project life. | Compare transmitter, receiver, controller, hydraulic integration, setup or relocation time and the number of farms or machines sharing the investment. |
|---|